Bridge One – continues

Work on Bridge 1 excavation continues.

The team have now exposed the edge of the remaining parts of the arch on both sides as well as started to uncover the original towpath through the bridge at Cosgrove

Volunteers for the next work parties on 1st, 8th and 11th Dec welcome 10am Lock Lane, Cosgrove

Towpath corner stone emerges from mud Sidewall of bridge emerges from mud Three works looking down into excavated bridge area