Gallery – Bridge 1 Restoration, Cosgrove

Restoration of bridge 1 on the Old Stratford branch began in 2015 with excavation of the mound that covered the remains. Once exposed, they were investigated and a plan put into place for restoration. Over the following years the new bridge was constructed, the dam removed and the section of canal past the bridge re-watered. The first boat cruised onto the arm in 2023, about 60 years after the last one to do so.

 

 

Return to gallery index